The vitamINN methodology

Turn uncertainty into decisions

The methodology structures the technological and manufacturing uncertainty of an industrial project: what’s missing, what to prioritise and when the next step can be taken.

What you gain

Nobody has to eyeball the TRL

✓A figure, not a hunch

Technological (TRL) and manufacturing (MRL) maturity is calculated deterministically from the project’s actual work.

✓Knowing what is missing

Each phase has its living list of evidence. At any moment you can see what’s left to level up.

✓Prioritising with criteria

The next step stops being a debate: it’s set by the pending work of the gate the project is in.

How it works

Four phases and two scales that advance in parallel

TRL measures the technology and MRL its manufacturing. Phases can advance in parallel: progress in either raises the project’s maturity.

Phase 1

Concept

TRL 2–4 · MRL 1–3

You define what you want to solve and check that the idea holds up.

Phase 2

Detail

TRL 4–6 · MRL 3–5

Detailed design, prototype and validation in a representative environment.

Phase 3

Industrialization

TRL 6–8 · MRL 5–7

The product gets ready for manufacturing: process, suppliers and costs.

Phase 4

Release

TRL 8–9 · MRL 7–10

Production and launch, with compliance and documentation closed.

Where it is used

The methodology is followed inside a project: it needs the plan, the risks, the documents and the maturity to calculate the gates. You access it from the Project Management module, in Readiness Level.

with projectProject ManagementReadiness Level

AI proposes, the gates decide

vitamINN reads the project and suggests each task’s status with its evidence. A person reviews and confirms. The level calculation is deterministic and auditable: it doesn’t depend on the mood of the day.

deterministicauditabletraceable

A living list, not a dead document

Cross-cutting tasks are reviewed in every phase: planning, risks, costs, industrial property and documentation. The project’s status updates with the work, not with meetings.

4 phasesTRL 1–9MRL 1–10
What you get

Where every project in the portfolio stands

Each project is positioned by technological and manufacturing maturity. With several, the portfolio map shows at a glance which one needs attention.

Maturity report · exportable Portfolio map · TRL × MRL
Project · maturity tracking
P-042 · Electromechanical actuatorPhase 2
Detailed design validated✓ done
Risk plan reviewed✓ done
Test in representative environmentpending
Cost structurepending
PDFDOCXXLSX+4
Why trust us

Data with a source

Real, official sources

Every result arrives with its reference, from the official source that publishes it.

BDNSEPO · EspacenetRegistro MercantilOpenAlexCrossrefarXiv

Verifiable numbers

TRL/MRL and eligibility are deterministic and traceable. The AI accelerates; the gates decide.

deterministicauditabletraceable

Two engines to match the work

Smart for day-to-day work and Expert for complex analysis, with native web search.

Smart engineExpert engineweb search

Try it with a real project

14-day trial · no card · for new accounts

Request access →